The MiG-23 assembly equipment (wing dollys, tail dolly, engine dolly, etc.) arrived on January 2nd. We were able to offload the equipment and put it together in a few hours. By the evening of the 2nd we had the MiG-23 wings up off the floor and onto the dollys.