We are still working on the logistics of arranging the aircraft both for display and easy access in and out of the hangers for flight. Our Mi-24, Bord 120 is shown leaving the hanger before engine and transmission run-up testing. We know from experience with Bord 118 that this will be more challenging once we reinstall the main rotor and tail rotor blades. The following video makes it look easy (with no blades and everything else out of the way).
No comments:
Post a Comment